A system integration team dedicated to test your systems according to your final configuration
Following full unit inspection in the workshop, electro-technical cabinets are connected together according to the final configuration of the HV substation.


The functioning of the whole substation is simulated during acceptance tests performed by the System integration team. We have 20 rooms fully equipped with supply and process simulators which enable us to test entire systems.
This upstream approach shortens SAT time and guarantees the proper functioning of the end products.