Protection control system revamping of the 63kV substation

Protection control system revamping in the Germiny-Sous-Coulombs natural gas underground storage site

Challenges

  • Equipment obsolescence
  • Scalability to fully digital
  • Absence of disturbance recording to analyze electrical faults

Benefits

  • Protection & control system reliability
  • Technology change while ensuring continuity of service
  • Installation maintainability

Key figures

  • 63 kV / 6.6 kV substation
  • 4 cabinets
  • 7 months of project