RTE Garonne Valley

Digitization of substations with SmartElectre

Brief description

The RTE (Power Transmission Network) Garonne Valley project is a comprehensive, multi-year program to refurbish 120 km of power lines in the Garonne Valley. It involves the rehabilitation of overhead lines (cables and pylons), the creation of underground links and the digitization of the substations.

As part of this project, SCLE is digitizing the substations using Smart Electre technology, with SCLE’s ARKENS range of protection and digital control systems, certified Origine France Garantie.

To date, SCLE has already digitized 9 substations on the Garonne Valley project.

Challenges

  • Upgrading existing infrastructure in the Garonne Valley
  • Connect the valley’s new renewable energy production plants
  • Change technology while ensuring continuity of service

Benefits

  • Digitisation of electrical substations without stopping operations
  • Improving the quality of electricity transmission in the Garonne Valley
  • Secure command and control of substations

Keys figures

  • RTE project over 10 years
  • RTE 63 kV network
  • 9 substations digitised by SCLE between Toulouse and Lannemezan