Factory Acceptance Tests (FAT)

A system integration team dedicated to test your systems according to your final configuration

According to our level of quality requirements, all our systems are subject to dual tests – unit + system – before delivery. 

Following full unit inspection in the workshop, electro-technical cabinets are connected together according to the final configuration of the HV substation. The functioning of the whole substation is simulated during acceptance tests performed by the System integration team. We have 20 rooms fully equipped with supply and process simulators which enable us to test entire systems.

This upstream approach shortens SAT time and guarantees the proper functioning of the end products. 

Contact a sales representative

for more information

Benoît Renhas

+33 5 61 61 74 76 rf.elcs@sahner.tioneb

Other related services

01

Electronics production

In-house mastery of the electronic production process

02

Electrotechnical production

Tailor-made electrical cabinets, kiosks and shelters, thanks to efficent means of production

Our products

Our ranges of products and solutions adapted to electrical networks & rail transport networks.

Join us

Do you have team spirit and the desire to participate in stimulating projects? Us too !

Stay in touch!

Subscribe to our newsletter

Our certifications

Any question?I would like to be contacted