RTE R#SPACE: Ploeren pilot station
Delivery of numerical control equipment from the ARKENS SV range
Delivery of numerical control equipment from the ARKENS SV range
Digitization of substations with SmartElectre Brief description The RTE (Power Transmission Network) Garonne Valley project is a comprehensive, multi-year program to refurbish 120 km of power lines in the Garonne Valley. It involves the rehabilitation of overhead lines (cables and pylons), the creation of underground links and the digitization of the substations. As part of […]
Upgrading and digitization of the 63kV digital command-control (CCN) substation with INEO Annecy
Step up security during maneuvers and rear base lane occupancy
Protection of HV Substation Power Line and Transformers
Installation of a Wye configuration system as part of the LGV+ project to modernize the Paris-Lyon high-speed line
Redesign of nuclear safety PCBs with Modumat 100 NG
The BAL is an automatic railway signaling system designed to ensure adequate spacing between trains running along the same track
Protection control system revamping of the 63kV substation
Protection and control system of the Monts de Lacaune wind farm clearing station
The DVL crosswind detector is deployed on the Bordeaux Tours high speed line and allows trains to be slowed down in real time in the event of high winds
The PMGI, an innovative and agile signaling system on the first tramway line in Avignon